The cement work should have been done to the whole wall.
Did the contractors take precautions to prevent asbestos fibers from floating throughout the house and exposing the family?
Is that why the fibers were only located by the cold air duct in the kitchen and in fact the flooring in the kitchen does not contain asbestos hence the negative test for the flooring samples taken away from the vent